İzmir-Aydın Motorway Eartworks (Motorway Body Formation)
- Home
- Lq-project
- İzmir-Aydın Motorway Eartworks (Motorway Body Formation)
İzmir-Aydın Motorway Eartworks (Motorway Body Formation)
| Employer Administration: | Kutlutaş-Dillingham M.T.O. |
| Work Site: | İzmir / TÜRKİYE |
| Contract Date: | 01.11.1995 |
| Completion Date | 02.05.2000 |
The 96 km İzmir - Aydın Highway Segment of the project arrives to Aydın over Tahtalıçay, Torbalı, Belevi, Germencik with a 21 km shorter route than the existing highway provided by the 75th Year Selatin Tunnel and is connected to Aydın - Muğla Crossing. |